Tests

HomeTests

Tests Applied

 

The following routine and type tests stipulated by TS 267 are applied to transformers whose assembly is completed and oil filling is completed after drying.

Routine Tests

  • Measuring winding resistances
  • Checking polarity or connection group
  • Measurement of short circuit voltage and load losses
  • Measurement of no-load losses and current
  • Induced voltage test
  • Applied voltage test
  • Measuring insulation resistances
  • Measurement of Dc Insulation resistance

Special Tests

  • Control of oil breakdown voltage
  • Measurement of lost angle (tg) (DUBLE experiment)
  • Measuring Paint Thickness

Type Tests

  • Temperature increase (Warming experiment)
  • Temperature increase (heating test)
  • Full wave impact test Measurement of audible noise level
  • boiler omar test) (for Hermetic Transformers
  • Mechanical resistance test against short circuits

(This test is carried out abroad in CESI/ITALY, IPH/GERMANY test laboratories.)

Except for the mechanical strength test against short circuits, all other types of tests are carried out in our company's laboratory.

Guaranteed Transformer – We provide Transformer service

Cookie Management
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
Accept More info
bottom:50px;right:30px; data-rot-id="3160"> WhatsApp Yaz
1